Groundworks RAMS & Method Statement

Groundworks RAMS carry the highest consequence risks on most sites - excavation collapse, buried services and plant / pedestrian interface. Principal Contractors expect to see service drawings, a permit to dig and a named temporary works arrangement, not a paragraph saying trenches will be battered back.

Groundworks & Civils

Groundworks RAMS Pack

Risk assessment and method statement for groundworks.

£49/ trade
  • Full method statement, mobilisation to handover
  • Traffic-light risk assessment, groundworks specific
  • COSHH, PPE, permits, emergency procedures
  • Editable Word document, your branding
Buy RAMS Pack, enquire
MOST POPULAR

Groundworks Contractor Project Pack

The full pack Principal Contractors want to see.

£99/ trade
  • Everything in the RAMS Pack
  • Registers, competency matrix, ITP, toolbox talks
  • 19 appendices, incl. real inspection forms
  • O&M, QA sign-off, submission checklist
Buy Project Pack, enquire

Risk assessment

Hazards covered for groundworks

Every hazard below is assessed with likelihood, severity and residual risk after controls, presented in the traffic-light format Principal Contractors expect.

  • Collapse of excavation sides and burial of persons
  • Contact with buried services - electricity, gas, water, telecoms
  • Plant and pedestrian interface, reversing and blind spots
  • Falls of persons or plant into open excavations
  • Underground obstructions, contaminated ground and made ground
  • Water ingress, flooding and unstable saturated ground
  • Noise, vibration and silica dust from breaking and cutting

Sequence of work

The method statement follows the real on-site sequence, with controls tied to each step rather than listed separately at the end.

  1. Service search, drawing review, CAT and Genny scan and trial holes
  2. Permit to dig issued and exclusion zones established
  3. Temporary works design for support, battering or benching
  4. Excavation in agreed sequence with support installed progressively
  5. Daily inspection and recording before each shift
  6. Backfill, compaction in layers and reinstatement
  7. Permanent edge protection or covering of any excavation left open

Competency

Cards and qualifications referenced

The competency matrix in the Contractor Project Pack is pre-populated with the qualifications a Principal Contractor will ask to see for this trade.

  • CPCS or NPORS card for each item of plant operated
  • Temporary works coordinator appointment
  • Excavation supervisor with confined space awareness where applicable

Need this on site by Monday?

Downloadable straight after payment, in editable Word format, ready to put your logo on.