Electrical Installation RAMS & Method Statement

Electrical installation RAMS are among the most heavily scrutinised submissions a Principal Contractor will review, because the work sits directly under the Electricity at Work Regulations 1989 as well as CDM 2015. A generic template that does not name your isolation procedure, your permit arrangements and your competency evidence will come back marked up.

M&E & Building Services

Electrical Installation RAMS Pack

Risk assessment and method statement for electrical installation.

£49/ trade
  • Full method statement, mobilisation to handover
  • Traffic-light risk assessment, electrical installation specific
  • COSHH, PPE, permits, emergency procedures
  • Editable Word document, your branding
Buy RAMS Pack, enquire
MOST POPULAR

Electrical Installation Contractor Project Pack

The full pack Principal Contractors want to see.

£99/ trade
  • Everything in the RAMS Pack
  • Registers, competency matrix, ITP, toolbox talks
  • 19 appendices, incl. real inspection forms
  • O&M, QA sign-off, submission checklist
Buy Project Pack, enquire

Risk assessment

Hazards covered for electrical installation

Every hazard below is assessed with likelihood, severity and residual risk after controls, presented in the traffic-light format Principal Contractors expect.

  • Contact with live conductors during alteration or extension of existing installations
  • Arc flash and arc blast when working at or near distribution boards
  • Stored energy in capacitors, UPS systems and standby supplies
  • Working at height for containment, tray and high-level cable runs
  • Manual handling of cable drums, containment lengths and switchgear
  • Cutting and drilling into structure - dust, buried services and asbestos in pre-2000 buildings
  • Temporary supplies and site electrics in wet or dusty conditions

Sequence of work

The method statement follows the real on-site sequence, with controls tied to each step rather than listed separately at the end.

  1. Design review, drawing check and confirmation of the point of isolation
  2. Permit to work and lock-off / tag-out applied, proved dead with an approved voltage indicator
  3. Containment installation - tray, basket, trunking and conduit set out
  4. Cable pulling, dressing and termination
  5. Inspection and testing to BS 7671, certification and schedules of test results
  6. Energisation under controlled conditions, functional testing and handover

Competency

Cards and qualifications referenced

The competency matrix in the Contractor Project Pack is pre-populated with the qualifications a Principal Contractor will ask to see for this trade.

  • 18th Edition BS 7671 qualification
  • City & Guilds 2391 inspection and testing
  • ECS / JIB gold card
  • Authorised person appointment for LV switching where applicable